Interested Basket

Interested Basket

  • Loading...

Mani Vista


Developer: Mani Group

Project RERA ID: HIRA/P/KOL/2019/000414

Mani Vista

Mani Vista by Mani Group is located in Tollygunge, Kolkata. This high rise project is sure to transform your lifestyle in a short time.The project offers the finest aspects of your dream home and a perfect view of glazing vistas so that you do not miss out on nature while spending a wonderful time in your chic home with your loved ones.

It is the tallest residential complex in the area. One can have 3 side open, vastu compliant apartments with a breathtaking view of the golf courses and more. The floor plans of Mani Vista offers unique blend of spacious as well as well-ventilated rooms.
  • Land Area : 2.50 Acre
  • Completion Date : Ready to Move
  • No. of Tower : 2
  • Open Space :70%
  • Height of Tower : G + 35
  • Size (Super Built Up) : 3 BHK 1795 sq.ft. 4 BHK 2364 sq.ft.
Salable Area: Super Built Up

Map

Mani Vista - Mani Vista, Netaji Subhash Chandra Bose Rd, Ashok Nagar, Tollygunge, Kolkata, West Bengal 700040

Get Direction
Education Institution
  • National Public School7.6 KM
  • Sri Sri Academy3.7 KM
  • South City International3 KM
  • MB Birla Foundation4.4 KM
Hospital
  • RSV Hospital1.3 KM
  • MR Bangur1 KM
  • CMRI Hospital Alipore6.4 KM
  • Bm Birla Heart Research Centre6.3 KM
  • Kothari Medical Centre6.2 KM
Hotspot
  • Tollygunge Metro1 KM
  • The Tollygunge Club1 KM
  • RCGC Golf Gardens1.5 KM
  • South City Mall3 KM
Residents Club

Residents Club

Indoor Games Room

Indoor Games Room

Yoga Meditation Garden

Yoga Meditation Garden

Lounge

Lounge

Kids Play Area

Kids Play Area

Table Tennis

Table Tennis

Swimming Pool

Swimming Pool

Gymnasium

Gymnasium

Carrom

Carrom

Cards Room

Cards Room

Billiards Room

Billiards Room

Bar Pub

Bar Pub

Banquet

Banquet

Bedroom

  • Flooring: Quality vitrified tiles
  • Walls: POP punning.
  • Doors: Entrance fitted with 35 mm thick flush-doors.
  • Windows: Standard section of anodized / powder coated aluminium or UPVC windows (casements / sliding) with clear glass inserts and matching fixtures.
  • Electrical: Totally concealed wiring for all rooms. Light plug and telephone points in all bedrooms. All rooms with provision for ceiling fans. Compatible wiring that can be hooked up to a cable. Television network with a connection thereof in all bedrooms.

Living Room

  • Flooring: Quality vitrified tiles
  • Walls: POP punning.
  • Doors: Entrance fitted with 35 mm thick flush-doors.
  • Windows: Standard section of anodized / powder coated aluminium or UPVC windows (casements / sliding) with clear glass inserts and matching fixtures.
  • Electrical: Total concealed wiring for all rooms. Light, plug and telephone points in all living rooms. All rooms with provision for ceiling fans. Compatible wiring that can be hooked up to a cable. Television network with a connection thereof in all living rooms.

Kitchen

  • Flooring: Anti-skid ceramic tiles
  • Dado: Quality vitrified tiles up to 2 ft above counter
  • Counter: Granite top
  • Sink: Stainless steel
  • Electrical: Totally concealed wiring for all rooms. Geyser points in kitchen

Toilet

  • Flooring: Anti-skid ceramic tiles
  • Wall: Matching ceramic tiles on wall.
  • Sanitary ware: White porcelain sanitary ware of Kohler / Roca or similar brands.
  • C.P fittings: Sleek, Jaquar or similar brand fittings.
  • Electrical: Totally concealed wiring for all rooms. Geyser points in toilet
  • Request Price
  • Note: Price includes flat cost + extra charges.
  • Independent ground covered car parking: Rs. 8,50,000/-
  • Independent open car parking: Rs. 6,50,000/-
  • N.B. Buyers are advised to check the price before making any final decision. Floor escalation charges Rs. 50/- per sq.ft from 6th floor onwards.


Payment Schedule

On agreement 10%
On commencement of piling 6%
On completion of basement roof 6%
On casting of roof of the 2nd floor 5%
On casting of roof of the 8th floor 4%
On casting of roof of the 14th floor 4%
On casting of roof of the 20th floor 4%
On casting of roof of the 26th floor 4%
On casting of ultimate roof 4%
On completion of brickwork upto the 15th floor 4%
On completion of brickwork upto the 20th floor 4%
On completion of brickwork upto ultimate floor 4%
On completion of external plaster of the tower 5%
On completion of plumbing activities of the designated unit 6%
On completion of air conditioning activities of the designated unit 5%
On installation of lifts 5%
On installation of lifts 5%
On completion of flooring of the designated unit 10%
On possession 10%